Putting In Drip Edge And Step Flashing: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

16 October 2024

31 August 2024

  • curprev 14:4014:40, 31 August 2024WaylonUdi58318 talk contribsm 2,979 bytes +20 No edit summary undo
  • curprev 08:5808:58, 31 August 2024DeborahRau30 talk contribs 2,959 bytes +2,959 Created page with "<br>Notice: Manufacturers provide specs about nailing schedule and minimal strip sizing, so you should definitely learn the set up directions that come with the shingles you’re utilizing. Before working the primary row of shingles, set up a piece of step flashing alongside the sidewall so that it sits tightly towards the roof. There are another issues to make when deciding if a steel or asphalt shingle roof is right for you. We’ll discuss some other important issues..."